Canada CRE News In Your Inbox.
Sign up for Connect emails to stay informed with CRE stories that are 150 words or less.

Canada’s First Floating Nuclear Plant Takes Shape At New Brunswick Port
A small industrial port in northern New Brunswick could become home to Canada’s first floating nuclear power plant — one built primarily in Ontario, shipped to its destination and designed to be replicated across the Arctic.
Montreal-based Prodigy Clean Energy is advancing the project near the Port of Belledune after selecting reactor technology from BWXT on Oct. 5.
The U.S. nuclear company’s Canadian operations would manufacture much of the facility in Ontario, including two reactors capable of generating 22 MW each. The proposed plant would have a generating capacity of up to 50 MW, enough to power 40,000 homes.
Unlike conventional nuclear facilities, Prodigy’s plant would arrive largely assembled, with installation targeted to take 18 months.
And Belledune could become much more than a generating site.
The project, developed with Pabineau First Nation and Eel River Bar First Nation, would also establish an operations and maintenance campus to service future plants, train workers and support expansion into remote industrial markets.
The First Nations-owned development adds another dimension to the Port of Belledune’s industrial ambitions. The region is also attracting interest from defence manufacturers, with a proposed $400M explosives production campus.
Targeted for operation in the early 2030s, the project could create more than 150 development jobs and approximately 40 permanent positions. Regulatory approvals and site selection remain outstanding.
- ◦Development